2023
Date issue |
NtS no. |
Concern |
Link |
2024-03-04 |
06/2024 |
Temporary closure of the Zacisze lock - a failure |
|
2024-02-19 |
05/2024 |
closing the passage under the Grunwaldzki Bridge in Wrocław - renovation works |
|
2024-02-15 |
04/2024 |
Opening of the Mieszczańska lock in Wroclaw for shipping |
|
2024-02-08 |
03/2024 |
Opening of the Zacisze lock |
|
2024-01-30 |
02/2024 |
withdrawal the restriction of the possibility of supplying the free-flowing Oder River with water discharges from barrages |
|
2024-01-09 |
01/2024 |
Temporary closure of the Zacisze lock – technical condition and icing |
|
2023-12-25 |
45/2023 |
the passage of a high-water wave on the Oder River |
|
2023-12-19 |
44/2023 |
Opening of the Zacisze lock – failure was removed |
|
2023-12-18 |
43/2023 |
Finished temporary restriction of the width of the navigable span on the Grunwaldzki Bridge in Wroclaw (km 250.5 of Oder River) |
|
2023-12-14 |
42/2023 |
Removal of floating navigation marks in the ODW section from the Rędzin Lock to the Brzeg Dolny Lock |
|
2023-12-07 |
41/2023 |
Temporary closure of the Mieszczańska lock - icing |
|
2023-12-03 |
40/2023 |
Temporary closure of the Zacisze lock - a failure |
|
2023-11-27 |
39/2023 |
Winter season on the Oder Waterway - possible occurrence of ice phenomena. |
|
2023-11-20 |
38/2023 |
Opening of the Opatowice lock – failure was removed |
|
2023-11-17 |
37/2023 |
Temporary closure of the Opatowice lock - a failure |
|
2023-10-25 |
36/2023 |
temporary restriction of the width of the navigable span on the Grunwaldzki Bridge in Wrocław (km 250.5 of Oder River) - renovation works |
|
2023-10-03 |
35/2023 |
Opening of the Mieszczańska lock in Wroclaw for shipping |
|
2023-10-02 |
34/2023 |
Temporary closure of the Mieszczańska lock - a failure |
|
2023-09-20 |
33/2023 |
Opening of the Bartoszowice lock – failure was removed |
|
2023-09-19 |
32/2023 |
Temporary closure of the Bartoszowice lock - a failure |
|
2023-08-21 |
31/2023 |
Change in operation of the Ratowice lock |
|
2023-08-18 |
30/2023 |
Restoration of the original clearance under the Roman Dmowski bridge in Wrocław - end of works on the structure |
|
2023-08-09 |
29/2023 |
Opening of the Opatowice lock – failure removal |
|
2023-08-08 |
28/2023 |
Temporary closure of the Opatowice lock - a gate failure |
|
2023-07-21 |
27/2023 |
Opening of the Oława lock – failure removal |
|
2023-07-17 |
26/2023 |
the temporary closure of the Oława lock |
|
2023-07-14 |
25/2023 |
the restriction of the possibility of supplying the free-flowing Oder River with water discharges from barrages |
|
2023-07-03 |
24/2023 |
the temporary closure of the Opatowice lock in Wrocław |
|
2023-06-21 |
23/2023 |
Opening of the Mieszczańska lock in Wroclaw for shipping |
|
2023-06-09 |
22/2023 |
Temporary closure of the Oder shipping lane from km 241 to 242 |
|
2023-05-26 |
21/2023 |
Temporary closure of passage under the Grunwald Bridge at km 250.5 of the Oder River |
|
2023-05-26 |
20/2023 |
Opening of the Zacisze lock |
|
2023-05-25 |
19/2023 |
Temporary closure of the Zacisze lock - a failure |
|
2023-05-24 |
18/2023 |
Change in traffic organisation on sections of the Downtown Floodway System in Wrocław |
|
2023-05-23 |
17/2023 |
Opening of a section of the Side Shipping Lane from Szczytniki Lock to the entrance of the Miejski Canal |
|
2023-05-22 |
16/2023 |
Concerns the opening of the ODW - the Downtown Floodway System sections from the Tumski Bridge and Piaskowy Bridge to the Mieszczańska Lock and the Opatowice and Bartoszowice Locks |
|
2023-05-19 |
15/2023 |
Concerning the issue of a device for testing water measurements at approx. km 250 +700 of the Oder River |
|
2023-05-19 |
14/2023 |
Concerning closure of sections of Oder Waterway - Inner-city Water Junction from Tumski Bridge and Piaskowy Bridge to Mieszczańska Lock and Opatowice and Bartoszowice Locks |
|
2023-05-18 |
13/2023 |
Concerning the passage of a high-water wave on the Oder River |
|
2023-05-10 |
12/2023 |
Regarding the opening of the Brzeg lock (km 198.4 of the Oder River) - end of renovation work |
|
2023-04-11 |
11/2023 |
Concerning temporary closure of the section of the Oder Waterway from Zacisze lock to Różanka lock |
|
2023-03-29 |
10/2023 |
Regarding the change of working hours of the Opatowice lock in Wrocław |
|
2023-03-27 |
09/2023 |
Change of hours of operation of Ratowice lock |
|
2023-03-27 |
08/2023 |
Regarding temporary closure of the section of the Side Shipping Lane in Wrocław - renovation works at Psie Pole weir |
|
2023-03-20 |
07/2023 |
Regarding temporary closure of the Brzeg lock (km 198.4 of the Oder River) - renovation works |
|
2023-03-13 |
06/2023 |
Opening of the Downtown Floodway System in Wrocław from Piaskowy and Tumski Bridges to Mieszczańska lock |
|
2023-03-10 |
05/2023 |
Concerning the display of floating beacons on the section of the Oder Waterway from km 261+600 to km 310+000 |
|
2023-02-25 |
04/2023 |
The completion of dismantling of supports for temporary crossing of the road bridge in Ścinawa |
|
2023-02-15 |
03/2023 |
The opening of sections of the Oder Waterway of the Wrocław Water Junction, i.e. the Lateral Sailing Route and the Downtown Water Junction from the Opatowice lock to the Szczytniki lock and Piaskowy and Tumski bridges. |
|
2023-02-15 |
02/2023 |
Opening of Różanka lock – completion of renovation works |
|
2023-01-27 |
01/2023 |
Brzeg Opolski lock to be temporarily closed due to renovation work |
2022
Date issue |
NtS no. |
Concern |
Link |
2022-12-24 |
53/2022 |
Temporary closure of the selected sections of the Wrocław Floodway System |
|
2022-12-23 |
52/2022 |
Concerning thaw - exceeding the warning levels on the Odra river - only polish version |
|
2022-12-13 |
51/2022 |
Concerning removal of floating navigation marks in the ODW section from the Rędzin Lock to the Malczyce Lock |
|
2022-12-09 |
50/2022 |
Temporary closure of the Różanka sluice - renovation works - necessary extension of the scope of the renovation - prolongation of the closure period |
|
2022-12-05 |
49/2022 |
Winter season on the Oder Waterway - possible occurrence of ice phenomena |
|
2022-11-30 |
48/2022 |
Temporary closure of the Bartoszowice and Opatowice locks in Wrocław - works on the power grid |
|
2022-11-23 |
47/2022 |
Temporary closure of the Bartoszowice and Opatowice locks in Wrocław - works on the power grid |
|
2022-11-15 |
46/2022 |
Permission for night navigation on the section of the Upper Oder River situated between the Opatowice lock and the Szczytniki lock in Wrocław |
|
2022-11-10 |
45/2022 |
Demolition works, support of the temporary road bridge in Ścinawa at km 331.90 of the Oder River - extension of the works completion deadline |
|
2022-10-22 |
44/2022 |
Demolition works, support of the temporary road bridge in Ścinawa at km 331.90 of the Oder river - restoration of the original height parameters of the crossing |
|
2022-10-11 |
43/2022 |
Temporary reduction of the minimum waterway depth in the ODW section from the Olawa lock to the Janowice lock |
|
2022-10-04 |
42?2022 |
Temporary closure of a section of the Main Navigation Waterway from Bartoszowice Lock to Zacisze Lock - construction of new Chrobry bridge |
|
2022-09-28 |
41/2022 |
Temporary reduction of the minimum waterway depth in the ODW section from the Olawa lock to the Ratowice lock |
|
2022-09-27 |
40/2022 |
Temporary reduction of the clearance under the Dmowski Bridge in Wroclaw |
|
2022-09-26 |
39/2022 |
Różanka lock to be temporarily closed due to renovation work |
|
2022-09-23 |
38/2022 |
Temporary closure of the Mieszczańska lock in Wrocław – malfunction |
|
2022-09-23 |
37/2022 |
The temporary closure of Bartoszowice lock - lack of power supply due to transformer replacement |
|
2022-09-19 |
36/2022 |
Temporary reduction of the minimum waterway depth in the ODW section from the Ratowice lock to the Janowice lock |
|
2022-09-15 |
35/2022 |
Temporary closure of sections of the Wrocław Water Junction - State Fire Service drill |
|
2022-09-12 |
34/2022 |
Temporary closure of passage under the Grunwald Bridge at km 250.5 of the Oder River |
|
2022-09-08 |
33/2022 |
Opening of the Mieszczańska lock – failure removal |
|
2022-09-06 |
32/2022 |
Opening of a section of the Wrocław Urban Waterway from Zwierzyniecki Bridge to the Miejska Lock, changing minimum waterway depth on sections of the South Oder, North Oder and Oder River in Wrocław |
|
2022-09-01 |
31/2022 |
Temporary closure of the Mieszczańska lock in Wrocław – malfunction |
|
2022-08-27 |
30/2022 |
Temporary closure of a section of the Wrocław Urban Waterway - intervention of the services in connection with the emergence of dead fish |
|
2022-08-25 |
29/2022 |
Temporary closure of a section of the South Oder River from Uniwersytecki Bridge to Pomorski Bridge in Wrocław |
|
2022-08-19 |
28/2022 |
Temporary closure of passage under the Grunwald Bridge at km 250.5 of the Oder River |
|
2022-08-18 |
27/2022 |
Navigation obstacle removal at km 255+200 of the Oder River |
|
2022-08-11 |
25/2022 |
temporary limitation of operating hours of the Ratowice lock - assembly works |
|
2022-08-11 |
24/2022 |
Temporary closure of the section of the South Oder River in Wrocław between the Mieszczańska Lock and the Dmowski Bridge due to construction works on the bridge. |
|
2022-08-05 |
23/2022 |
Navigation obstacle at km 255+200 of the Oder River |
|
2022-08-05 |
22/2022 |
Rebuilding of a road bridge in Krosno Odrzańskie at km 514.1 of the Oder River change in communication rules |
|
2022-08-05 |
21/2022 |
Opening of the Mieszczanska lock - restoration of water damming level at the Redzin weir |
|
2022-08-04 |
20/2022 |
Temporary closure of the Mieszczańska lock – fall of water level at Rędzin weir |
|
2022-07-14 |
19/2022 |
Temporary closure of the Ratowice lock – works on platforms |
|
2022-05-31 |
18/2022 |
Rebuilding of a road bridge in Krosno Odrzańskie at km 514.1 of the Oder River |
|
2022-05-17 |
17/2022 |
Change of operating hours at the Ratowice lock |
|
2022-05-13 |
16/2022 |
Regarding the decrease of the minimum waterway depth on free-flowing Oder River |
|
2022-05-10 |
15/2022 |
Completion of works on the road bridge in Ścinawa at km 331.90 of the Oder river - restoration of the original height parameters of the crossing |
|
2022-04-29 |
14/2022 |
Works in the upper canal of Ratowice lock - temporary closure of the Oder Waterway section from Oława lock to Ratowice lock. |
|
2022-04-27 |
13/2022 |
Celebration of the end of the "Aktywni Błękitni" [Active Blue] campaign - temporary closure of the Różanka lock with the upper and lower canal locks |
|
2022-04-20 |
12/2022 |
Opening of the Ratowice lock |
|
2022-04-14 |
11/2022 |
Opening of the Mieszczańska, Szczytniki and Miejska locks |
|
2022-04-11 |
10/2022 |
Military exercises in overcoming a wide water obstacle in Biała Góra 19 April - 27 May 2022 |
|
2022-03-14 |
9/2022 |
Opening of the Zacisze lock – failure removal |
|
2022-03-08 |
8/2022 |
Opening of the Opatowice lock |
|
2022-03-08 |
7/2022 |
Temporary closure of the Zacisze lock – a hydraulic system failure |
|
2022-03-04 |
6/2022 |
On restoration of navigational markings and transit depth in the ODW section from Rędzin Lock to Brzeg Dolny Lock |
|
2022-02-23 |
5/2022 |
The tenovation of the railroad bridge in Nietkowice at km 490.5 of the Oder river - completion of the works |
|
2022-02-02 |
4/2022 |
Resumption of operations at the Bartoszowice lock – removal of a fault |
|
2022-02-02 |
3/2022 |
The completion of the demolition work on the old discharge pipeline - Żelazny Most in Głogów |
|
2022-01-31 |
2/2022 |
Temporary closure of Bartoszowice lock - failure of canal gate valves |
|
2022-01-03 |
1/2022 |
Temporary exemption from fees for the use of inland waterways and their sections as well as the water facilities owned by the State Treasury located on inland surface waters during the period from 1 March 2022 to 31 December 2022, related to countering the effects of the COVID-19 pandemic |
2021
Date issue |
NtS no. |
Concern |
Link |
2021-12-22 |
72/2021 |
removal of floating navigation marks in the ODW section from the Rędzin Lock to the Brzeg Dolny Lock |
|
2021-12-17 |
71/2021 |
the closure of Opatowice, Szczytniki, Mieszczanska and Miejska locks - winter season |
|
2021-12-07 |
69/2021 |
Hydrotechnical works - drilling under the bed of the Oder River at km 490.5 (below the railroad bridge in Nietkowice) |
|
2021-12-07 |
68/2021 |
Temporary closure of Opatowice lock - maintenance works - extension of works deadline |
|
2021-12-06 |
67/2021 |
Winter season on the Oder Waterway - possible occurrence of ice phenomena |
|
2021-12-01 |
66/2021 |
temporary closure of the Opatowice lock – maintenance works and change in lock operating hours |
|
2021-11-03 |
65/2021 |
temporary closure of the Zacisze lock – works on the power grid |
|
2021-10-21 |
64/2021 |
Ratowice lock reconstruction – change of lock closure date in the autumn/spring season 2021/2022 |
|
2021-10-11 |
63/2021 |
No possibility of artificial feeding of the unregulated Oder River |
|
2021-10-08 |
62/2021 |
Confirmation of the date of Ratowice lock closure in 2021/2022 autumn and spring season |
|
2021-09-29 |
61/2021 |
Opening of the Zacisze lock |
|
2021-09-28 |
60/2021 |
Temporary closure of Zacisze lock in Wroclaw – electrical failure |
|
2021-09-09 |
59/2021 |
Opening the Oder river section from Piaskowy and Tumski bridges to the Mieszczanska sluice in Wroclaw for night navigation |
|
2021-09-08 |
58/2021 |
Opening of the Wrocław byway from the Szczytniki lock to the Miejska lock |
|
2021-09-07 |
57/2021 |
opening of the Oder Waterway between km 181.3 (mouth of the Nysa Kłodzka River) and the Oława Sluice |
|
2021-09-06 |
56/2021 |
The opening of the Downtown Water Junction in Wrocław |
|
2021-09-05 |
55/2021 |
Opening of the Opatowice sluice in Wrocław |
|
2021-09-04 |
54/2021 |
Opening of the Downtown Water Junction section - from the Piaskowy Bridge to the Maciej Bridge |
|
2021-09-02 |
53/2021 |
passage of a flood wave on the Oder River - closure of the selected sections of the Wrocław Floodway System |
|
2021-09-02 |
52/2021 |
opening the Bartoszowice lock |
|
2021-09-02 |
51/2021 |
the passage of a flood wave on the Oder River - closure of the ODW section starting from km 181.3 - the estuary of Nysa Kłodzka to Oława Lock |
|
2021-09-01 |
50/2021 |
temporary closure of Bartoszowice lock - failure of canal gate valves |
|
2021-09-01 |
49/2021 |
passage of a flood wave on the Oder River |
|
2021-08-27 |
48/2021 |
temporary closure of the Malczyce sluice – acceptance tests |
|
2021-08-12 |
47/22021 |
renovation of the railroad bridge in Nietkowice at km 490.5 of the Oder river - extension of the works completion deadline |
|
2021-08-10 |
46/2021 |
Concerning the disassembly of the 400 kV power line at km 271+250 of the Oder river |
|
2021-08-09 |
45/2021 |
the opening of sections of ODW from km 181.3 (mouth of the Nysa Kłodzka River) to Oława sluice and of the Wrocław Side Navigation Route from the Szczytniki sluice to the Municipal sluice. |
|
2021-08-06 |
44/2021 |
passage of the flood wave on the Oder River - closure of the sections of ODW from km 181.3 -passage of the flood wave on the Oder River - closure of the sections of ODW from km 181.3 -mouth of the Nysa Kłodzka River to the Oława |
|
2021-08-06 |
43/2021 |
passage of a flood wave on the Oder River |
|
2021-08-05 |
42/2021 |
Change of operating hours of the Opatowice sluice in Wrocław |
|
2021-07-29 |
41/2021 |
Opening of the Wrocław byway section from the Szczytniki lock to the Miejska lock |
|
2021-07-26 |
40/2021 |
demolition work on the old discharge pipeline - Żelazny Most in Głogów |
|
2021-07-14 |
39/2021 |
Restoration of the fairway depths at the Oder Waterway section from Opatowice lock to Mieszczańska lock |
|
2021-07-06 |
38/2021 |
limiting the possibility of damming water at Brzeg Dolny water barrage - construction of a fish ladder |
|
2021-07-05 |
37/2021 |
On the opening of Mieszczańska lock in Wrocław |
|
2021-06-28 |
36/2021 |
closure of the Mieszczańska lock in Wrocław – failure of gate valves |
|
2021-06-23 |
35/2021 |
On the opening of Mieszczańska sluice in Wrocław |
|
2021-06-18 |
34/2021 |
the opening of a section of the Oder River from the Szczytniki lock to the Mieszczanska lock in Wroclaw for night navigation |
|
2021-06-11 |
33/2021 |
final testing on the Malczyce water barrage |
|
2021-06-09 |
32/2021 |
closure of the Mieszczańska lock in Wrocław – failure of gate valves |
|
2021-06-09 |
31/2021 |
On the opening of Mieszczańska sluice in Wrocław |
|
2021-06-05 |
30/2021 |
closure of Mieszczańska lock in Wrocław - failure of control devices |
|
2021-06-05 |
29/2021 |
On Restoring the operation of Lipki sluice - partial removal of failure |
|
2021-06-03 |
28/2021 |
on reduction of the fairway in the ODW section from Opatowice Lock to Mieszczańska Lock |
|
2021-06-02 |
27/2021 |
closing of the Lipki lock - failure of canal gate valves |
|
2021-06-02 |
26/2021 |
opening of the section of the Side Waterway in Wrocław from the exit of the lower canal of Szczytniki lock to the entrance to the Miejski canal |
|
2021-05-27 |
25/2021 |
opening of the ODW sections from km 181.3 - the Nysa Kłodzka estuary to Bartoszowice and Opatowice locks |
|
2021-05-27 |
24/2021 |
reduction of transit depth in the ODW section from Rędzin Lock to Brzeg Dolny Lock |
|
2021-05-25 |
23/2021 |
the opening of the Downtown Water Junction in Wrocław |
|
2021-05-15 |
22/2021 |
the passage of a flood wave on the Oder River - closure of the Downtown Water Junction in Wrocław |
|
2021-05-14 |
21/2021 |
the passage of a flood wave on the Oder River - closure of the ODW section starting from km 181.3 - the estuary of Nysa Kłodzka to Bartoszowice Lock and Opatowice Lock |
|
2021-05-14 |
20/2021 |
passage of a flood wave on the Oder River |
|
2021-04-30 |
19/2021 |
opening the lock at Ratowice |
|
2021-04-30 |
18/2021 |
opening of Opatowice and Mieszczańska locks and the sections of the Downtown Water Junction |